This week's Boston Marathon tragedy has staggered the nation and cast the signature cavalier east coast Boston attitude with an ill shadow. I am a Massachusetts native and can still spell that goddamn state name without so much as missing a beat. I was born and raised in the "armpit" of Mass., attended school in Amherst and I ran the Boston Marathon back in 1998 and so this story hits particularly close to home for me. Heartbreak hill will never be the same.
I am fortunate in that I did not lose anyone in this tragic event, but there is a piece of me that was recently lost. A couple months ago I lost someone I was close with, an ardent EV dreamer and an early convert to the TDI EV dream I began hatching back in 2010. The owner of the first EVC TDI conversion I ever did and one business relationship that forged a lasting friendship. I trust you are in a better place now Keeder, and I wish you the best on the ultimate adventure you are undertaking. Be well my friend.
Thursday, April 18, 2013
Wednesday, February 6, 2013
AHU/1Z TDI engine stage IV tune/build
While it may seem like I've been hibernating for the past month, I've actually been up to my eye lids with misc projects clearing the deck for this particular engine build. Well now it's go time and the engine is on the stand and in the process of getting rebuilt.
This one is getting the full treatment, so here we go:
Clean engine block back from the machine shop bored 0.50mm over. Head bolt holes being chased. Once all critical holes are chased the engine is blasted clean with compressed air and brake cleaner, taped up and painted with engine enamel high temp paint.
Then the oil squirters are cleaned and installed with loctite.
Main bearing caps with bearings installed being checked for radial clearance with Plastigage. Once clearances are checked bearings/crank are cleaned and assembly lube applied and then the main bearing caps are bolted down with new bolts, 48ft/lbs + 90*.
Next up: Piston time! These sweet ASV pistons are mated to rods, Rosten H-beam rods in this case and then, and then installed in the engine block in pairs, cylinders 2 & 3 shown here before final installation.
Radial clearances of rod bearings are then checked with Plastigage, cleaned, lubed and installed with the provided ARP bolts.
DV oil pan cleaned and ready to install.
DV oil pump installed, bolts torqued to 18 ft/lbs and pump shaft checked for unrestricted movement.
Piston projection being measured for head gasket size.
Rebuilt head with port n polish intake/exhaust runners.
1-notch head gasket and shiny sealing surface of head.
Head gasket installed and ARP head studs threaded in. The two corners have head gasket locating pins installed which will be removed once head is seated and tightened slightly.
Another angle of the studs--one of my favorite sights.....
Port and polish detail.
Head installed, head studs torqued to spec and valve cover loosely installed.
PD150 intake manifold with EGR delete race pipe installed.
Another angle on this sweet intake.
Valve cover installed to keep things clean.
Cam line being prepped for cam install.
Cam bearing caps removed for cam install. Valve ends and bearings are lubed with assembly lube.

Colt cam installed and assembly lube copiously applied.
Timing belt installed and engine timed.
Exhaust manifold and turbo installed.
K03/04 hybrid turbo impeller.
K03/04 hybrid turbo.
Belted up and almost 100% finished.
Being lifted off engine stand. G60/VR6/TDI/Vanagon hybrid 228mm clutch setup installed.
Completed engine floating in space.
Trailer backed into shop and engine strapped to pallet.
Ad hoc work station for building the crate.
Syncro tranny in foreground, eng and front diff on pallet.
Front diff, trans and eng all strapped/screwed down and blocked in.
Crate magically sprouted up around the pallet. I was in such a frantic rush to put this together I didn't get any pics mid-process.
And there's my errant thumb dressed up after getting back from urgent care....
And there it is once that bandage came off as I raced to finish the crate.
And one more pic from this morning. T15 bit went in at the bottom and came out the other side. The doc had to slice the wound open in order to clean it and one stitch later I'm all put back together.
This one is getting the full treatment, so here we go:
| Headbolt hole chasing. |
Then the oil squirters are cleaned and installed with loctite.
| Main bearing bolt hole chasing. |
| Nice shiny new K&S main bearings, #4 cap gets the slotted bearing shell for improved lubrication. |
![]() |
| Ring compressor tool at the ready to compress rings and slide these pistons into their new homes. |
Next up: Piston time! These sweet ASV pistons are mated to rods, Rosten H-beam rods in this case and then, and then installed in the engine block in pairs, cylinders 2 & 3 shown here before final installation.
![]() |
| Rod caps #2 and #3, plastigage check. |
Radial clearances of rod bearings are then checked with Plastigage, cleaned, lubed and installed with the provided ARP bolts.
![]() |
| Rod caps 4 and one, radial clearances all check out. |
| Bottom end complete. |
| Pistons 3 and 2 high and proud. |
![]() |
| Pistons 4 and 1 high and proud. |
Longblock assembly:
Febi oil pump being opened up. Oil pan baffle installed with A4 TDI oil pan sealant on both sides of gasket.DV oil pan cleaned and ready to install.
DV oil pump installed, bolts torqued to 18 ft/lbs and pump shaft checked for unrestricted movement.
Piston projection being measured for head gasket size.
Rebuilt head with port n polish intake/exhaust runners.
1-notch head gasket and shiny sealing surface of head.
Head gasket installed and ARP head studs threaded in. The two corners have head gasket locating pins installed which will be removed once head is seated and tightened slightly.
Another angle of the studs--one of my favorite sights.....
Port and polish detail.
Head installed, head studs torqued to spec and valve cover loosely installed.
PD150 intake manifold with EGR delete race pipe installed.
Another angle on this sweet intake.
Valve cover installed to keep things clean.
![]() |
| Custom Colt Cam stage II to let this engine breath a little more freely. |
Cam bearing caps removed for cam install. Valve ends and bearings are lubed with assembly lube.
Colt cam installed and assembly lube copiously applied.
Timing belt installed and engine timed.
Exhaust manifold and turbo installed.
K03/04 hybrid turbo impeller.
K03/04 hybrid turbo.
Belted up and almost 100% finished.
Being lifted off engine stand. G60/VR6/TDI/Vanagon hybrid 228mm clutch setup installed.
Completed engine floating in space.
Crating up engine for shipment to Hawaii
What an adventure this was yesterday! I spent all day securing the engine/trans/diff to a pallet, building a crate and then racing up to the terminal in Salem. In the process I managed to put a T15 torx driver bit through my thumb. Skipping lunch and dinner due to a pressing deadline only to spend an hour at urgent care getting it cleaned and stitched up was a sad commentary on the day. Here's some pics I managed to take:Trailer backed into shop and engine strapped to pallet.
Ad hoc work station for building the crate.
Syncro tranny in foreground, eng and front diff on pallet.
Front diff, trans and eng all strapped/screwed down and blocked in.
Crate magically sprouted up around the pallet. I was in such a frantic rush to put this together I didn't get any pics mid-process.
And there it is once that bandage came off as I raced to finish the crate.
And one more pic from this morning. T15 bit went in at the bottom and came out the other side. The doc had to slice the wound open in order to clean it and one stitch later I'm all put back together.
Project sipster
I just stumbled upon this cool A1 Rabbit TDI project at MotoIQ. The goal was to build a car for under $7k that could do 0-60mph in <7secs 70mpg.="" and="" get="" nbsp="" p="">
This pulls at my Rabbit heart strings and plucks the TDI chord at the same time:
http://www.motoiq.com/magazine_articles/id/1896/project-sipster-part-8-all-the-drag-reducing-details.aspx7secs>
This pulls at my Rabbit heart strings and plucks the TDI chord at the same time:
http://www.motoiq.com/magazine_articles/id/1896/project-sipster-part-8-all-the-drag-reducing-details.aspx7secs>
Friday, December 7, 2012
VW's new line of TDI cars
This is a page I just bumped into, more TDI propaganda and some surprising MPG/model comparisons:
http://web.vw.com/tdi-clean-diesel/index.php#tdi-models
http://web.vw.com/tdi-clean-diesel/index.php#tdi-models
Wednesday, November 14, 2012
2000 EVW Eurovan Weekender T4 1.9 TDI and 5-spd conversion
2000 Eurovan 4-cyl TDI conversion w/5-spd conversion
| Maiden voyage w/TDI eng and 5-spd trans. |
With stock VR6 & auto trans:
| 2000 Eurovan MV Weekender with 395k miles on stock VR6 eng/auto trans. |
I am now in the process of converting it to TDI and 5-spd and built it from the bottom up to handle 200+hp and 400+ft/lbs torque. Most of the mods are intended to increase the air flow through the engine to achieve maximum power output and minimize inherent airflow inefficiencies. These performance mods include:
- Ported and polished rebuilt cylinder head
- Custom ported/polished/coated PD150 intake manifold
- huge VNT-17/22 hybrid turbo
- Stage II custom cam grind from Colt Cams, Inc. of Canada
- Rosten H-beam rods
- ARP head studs
- 11mm ALH injection pump configured to work on 1Z/AHU IP bracket and with the 1Z/AHU harness
- HFLOx warp 4 injectors rebuilt/balanced by DFIS in PDX.
| 1Z block loaded with 0.50mm over ASV pistons. |
| P n P intake and exhaust runners. |
| Measuring piston height projection |
| Head mated to 1Z block, secured with ARP head studs. |
| VNT-17/22 turbo. |
| Another shot of turbo. |
| PD150 intake manifold PnP with 2.5" race pipe. |
![]() |
| Front view. |
| Race pipe view. |
| Race pipe removed view. |
| Installed view. |
![]() |
| Inj. pump plugs shown for comparison: AHU plugs on the L (8 and 3 pin), ALH plug combines the two plugs into one 10 pin plug. |
| IP harness retrofitted with AHU plugs, and installed on 1Z eng. |
| Stock unmodified AHU IP bracket on R, and modified AHU IP bracket on left machined out to 68mm to fit the ALH IP hub. |
| 11mm ALH IP wiring with AHU plugs shown. |
![]() |
| ID plate from IP. |
| Wiring harness from 97 Passat with FA ECU. This will replace the 12'+ of VR6 wiring harness in the pic below. |
| VR6 eng harness on R, auto trans harness on L. |
| Time to add a clutch pedal and clutch hydraulics to this 2000 EV automatic. |
| Clutch hydraulic line shown from master cyl to fire wall exit into eng bay. |
| EGT probe install pre-turbine on VNT-17-22 hybrid |
| Complete engine mated to trans almost ready for install. |
| View from trans side. |
| View from back side. |
| Front view of eng on a tall dolly ready for lowering the van for install. |
| Engine timed, oil primed, ready to run. |
| Timing belt business end of engine. This IP pulley fits the ALH IP and fits under the T-belt cover unmodified. |
![]() |
| View of tilted oil filter flange, larger V6 Passat oil cooler, SS turbo oil supply line, new starter and new trans mount. |
![]() | ||
| 1Z wiring harness disassembled, lengthened where needed and soon to be taped back up. |
![]() |
| Test fitting modified TDI harness before re-wrapping and final installation. |
| Preview of the fun part of this conversion: Mating the harness to the fuse block. |
![]() |
| Stock MK3 Jetta pedal cluster |
Time for some pedal fun!
![]() |
| Close up of thottle pedal potentiometer upper right. |
| Final install. Pedal is installed in stock position only now it pulls the pedal pot instead of a throttle cable. This plugs into the ECU wiring for electronic throttle control. |
Diesel filter install:
| First identify a suitable location; build a bracket to hold a VW diesel fuel filter: install. |
| Diesel fuel filter in custom adapted MK2 Jetta diesel bracket. |
![]() |
| Fuel filter and injection pump primed with fuel, ready to fire!! |
| VCDS communication! Not bad for first attempt. This thing is now ready to fire up and fine tune timing. |
I'm three weeks into this conversion and 5 weeks since I started the engine build on Halloween day. I'm at the point I think of as the doldrums in every conversion I've ever done. Each day more stuff is getting taken care and all the major systems are final, yet it feels like the strong gale has died off and the only progress is made by tedious tacking fore and back. Lots of little stuff that eats up time: tying up loose ends on wiring, securing vacuum hoses, double checking torque specs, topping off fluids, etc. It's at this point every time that I'm amazed anyone ever completes one of these--it's certainly not for the faint of heart nor those short on attention to painful minutia. It is doable though--provided you have enough patience, perseverance and of course money! The light at the end of the tunnel is within sight and soon all this hard work will be putting a smile on my face as I drive down this rig down the road.
Tomorrow
I plan on rebuilding the front suspension before driving it out of the
shop on its maiden voyage. Hopefully I'll get all this done with enough
time to get an alignment by the end of the day: R&R both
axles, both lwr ball joints, both tie rod ends, both sway bar links,
both shocks and install the winter tires. And if things go really well I
hope to get an appt with the exhaust shop on Fri to have an exhaust sys
installed.
| Success is so sweet. On the maiden voyage with the new drive train. |
I hit a couple snags working on the suspension yesterday that precluded me from driving out of the shop on Thurs. I had a brand new Lobro CV joint (the expensive German ones) come apart in my hands so that was the big deal breaker. I had to overnight a new CV joint and fortunately had it by 9am this morning and was able to finish the front end work and get this puppy on the road in short order. Luckily I was able to get a last minute appt at the muffler shop today and had them build/install a 2.5" straight pipe exh system on it, so I guess I still met that goal. It's now at the alignment shop and I'll pick it up first thing tomorrow AM and then I finally can start having some fun driving it around and breaking in the new motor--perfect time to rest my work-weary hands a bit.....
_________________________________________________
My ultimate Eurovan Weekender TDI build is continued in these subsequent posts in sequential order:
115a aux. battery and Sure Power battery isolator install:
Low pressure warning light and oil analysis:
Syncro conversion time!
Headlights upgrade ver. 1.0
OE big brake upgrade
LPG bottle custom bracket
Propex heater and propane tank install
Rear wheel bearing replacement
Fender panels R&R
Hood/rocker panels bedliner
Spare tire carrier install
02D syncro trans service
Inop speedometer/odometer repair
Subscribe to:
Posts (Atom)

















